• Home
  • Softball

    Varsity Softball

    JV Softball

    Season Dates: February through May/June

    Tryout Location / Times / Requirements: Tryouts begin February 25, 2008 at 3:45 after school on the softball field. Athletes must have a current physical on a VHSL physical form, and a 2.0 GPA, prior to trying out.

    Additional info: Off-season conditioning will begin after Thanksgiving, and runs up until the week or so before tryouts. Students should listen to the announcements for important meetings and information regarding the dates and times for conditioning.

    The Chesapeake Public School System is an equal opportunity school system. The School Board of Chesapeake adheres to the principle of equal opportunity in employment and, therefore, prohibits discrimination in terms and conditions of employment on the basis of race, sex, national origin, color, religion, age, or disability.

    Design based on site by gorotron downloaded from Free Templates.